This room started out with an animal print border as well - this time a bath tub theme!
We ripped out the peeling fiberglass surround, linoleum and laminate flooring, and plastic fixtures and replaced them with subway and hex tile and a new shiny chrome faucet, handle, and showerhead.
After the bones of the room were complete, we started to focus on the decor. I came up with an idea board for the space:
We painted the room a deep, rich gray:
And added a few finishing touches:
Still to do:
- A few pieces of trim still need to be installed
- More art
- Some sort of window treatment
- A rug?
So there you have it! Our three big projects of 2011. We're no Young House Love (our year of projects is probably equal to about a week of theirs), but we're slowly plugging along to make our little home a cozy one.
Here's to more steady progress in 2012!
sometimes it's those little things that take the longest. I have a pet peeve with myself. I never finish up the last little details....I hope in 2012 that I fix that.
ReplyDeleteI really love that wall color!
ReplyDeleteIt's funny because our master bathroom has been one of the smaller projects on our list and it's been about a year now since we started on it.... and it still needs a lot more done to it lol.
BEAUTIFUL!! Love the color combo's! You have such a great eye!
ReplyDeleteThis looks AMAZING! I absolutely love the color combination. Stunning.
ReplyDelete